News: HyperSizer.com has a Community Board and Customer Support System. Submit a ticket at http://hypersizer.com/ticket

Author Topic: Tee and Hat pull off analysis  (Read 20771 times)

Stressed

  • *
  • Posts: 42
    •  
Tee and Hat pull off analysis
« on: September 15, 2010, 10:29:09 AM »
The tee pull off analysis for our curved structures is often our critical Margin of Safety (Out of plan loading). The analysis must be correlated with test. Hypersizer needs to include this failure mode and TBD analysis method in the near future.

Our current Tee pull off analysis process is to extract loads from the Natran F06 file and post process in a VBA code. Productivity would be greatly enhanced if Hypersizer could determine pull off margins of Safety and graphically show the results.
David Johnson
Hitech Global Solutions Inc